This Carpinteria location posed some challenges because a coastal permit was required to proceed, but Go Green Solar Solutions has 36 years of Coastal Commission construction expertise, and is able to comply with even the most stringent regulations.

This entry was posted in . Bookmark the permalink.

Leave a Reply